Back to This Old House

This Old House

The Manchester House - 5

S23E5 Oct 20, 2001 Runtime TBD

No episode image

The foundation has been backfilled and carpenters are busy putting up the forms for the new terrace. Inside, the area for the new kitchen and family room has been completely opened up, thanks to a 3800-pound steel and laminated lumber beam Tommy and his crew engineered and inserted through the side of the building. Within the new space, kitchen cabinet designer and builder Ted Goodnow works with David and Janet McCue to begin to lay out the new kitchen, pantry and office. Ted takes David and Steve to a nearby kitchen built his firm to get some more ideas about design features and materials. Back at the house, Tommy and our master carpenter investigate some archeology revealed during demolition: original fabric of the building, including the roof, a dormer and a gabled sidewall. The original wood roof shingles are an important factor as our master carpenter begins to consider roofing choices with roofing contractor Mark Mulloy and product rep Steve Miller, who shows them a treated shing

Plex login required

Sign in with Plex to view and queue download candidates.

Plex Login

Episode details

Episode: S23E5

Aired: Oct 20, 2001

Runtime: Runtime TBD