Back to This Old House

This Old House

Lexington Project 2015: Part 7: Inspections

S36E15 Feb 14, 2015 Runtime TBD

Lexington Project 2015: Part 7: Inspections still

Rough mechanical and rough framing inspections are discussed; reinforced fiberglass columns to support the farmer's porch are installed; how an arched doorway is being turned into one that's squared off; and the storm window system being using to enclose the screen porch is spotlighted.

Plex login required

Sign in with Plex to view and queue download candidates.

Plex Login

Episode details

Episode: S36E15

Aired: Feb 14, 2015

Runtime: Runtime TBD