Back to This Old House

This Old House

Cambridge | Things Are Coming Together

S27E17 Jan 26, 2006 Runtime TBD

No episode image

With only a week left on the project, master carpenter Norm Abram finds general contractor Tom Silva at work on the dramatic 3-story stair. With the teak treads and bronze balustrade finally in, Tom can work on installing the teak handrail. Audio/visual specialist Dan Chadwick shows host Kevin O'Connor how he's concealing a 61" plasma TV in the living room, and adding acoustical panels to enhance the sound in the room. Designer Todd Tsiang shows Kevin the modern fireplace mantle, tile, plumbing fixtures, and the fully decorated master suite. Tom reveals the private roof deck off the master bedroom as a new modular steel railing system is installed. Landscape contractor Roger Cook visits a 500-acre sod farm in Rhode Island to see how sod is grown and harvested. In the wet bar, tile contractor Joe Ferrante shows Norm a "bubbly" glass tile being installed on the backsplash.

Plex login required

Sign in with Plex to view and queue download candidates.

Plex Login

Episode details

Episode: S27E17

Aired: Jan 26, 2006

Runtime: Runtime TBD