Back to This Old House

This Old House

The Milton House - 5

S19E5 Oct 25, 1997 Runtime TBD

No episode image

Our master carpenter's workshop continues to take shape, as Richard Trethewey lays out radiant floor heating tubes over a layer of rigid insulation. We meet audio/visual systems contractor Steve Hayes to get a preview of what the new media room may look like, and visit a showroom to see the range of equipment options. We see a virtual walk-through of the new workshop put together by Randy Levere, while the crew tears down the old kitchen addition, which has revealed itself to be woefully built. Paint stripper Brooks Washburn uses a paraffin-based paste to remove dozens of layers of old paint from the front staircase, and our host suggests trying it out on the historic front facade. Finally, the concrete arrives to complete the floor of the new workshop.

Plex login required

Sign in with Plex to view and queue download candidates.

Plex Login

Episode details

Episode: S19E5

Aired: Oct 25, 1997

Runtime: Runtime TBD