Back to This Old House

This Old House

The Wayland House - 8

S13E8 Oct 24, 1991 Runtime TBD

No episode image

Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.

Plex login required

Sign in with Plex to view and queue download candidates.

Plex Login

Episode details

Episode: S13E8

Aired: Oct 24, 1991

Runtime: Runtime TBD